Tag Archives: Steel Fabrication

24 Oct 2014

Although the construction of steel buildings began way back in the 20th century, their use became more widespread during World War II and significantly expanded after the war when steel became more readily available.

Steel buildings have been widely accepted, in part due to cost efficiency. What’s more, the range of application has expanded with improved materials, products and design capabilities and with the availability of computer aided design software.

Here at PRV Engineering we offer a first-class steel framework fabrication and concreting service. Designed as an extension to the services we already provide for the construction industry, and for businesses that are very cost conscious, we believe our new facility is the ideal solution.

7 Nov 2013

As part of a £1 million plus investment programme, PRV Engineering now offers a new steel framework fabrication and concreting service. Designed as an extension to the services the company already provides  for the construction industry, and for businesses that are very cost conscious, PRV’s new facility is the ideal solution.

A NEW Steel Framework Fabrication Service

22 Aug 2013

What is CE Marking?

CE Marking is the conformity marking for products sold in the European Union and has been a common requirement on things such as toys and electrical goods for many years. It consists of the CE-Logo and, if applicable, the four digit identification number of the notified body involved in the conformity assessment procedure.

What does the CE mark mean?

By affixing the CE mark a person takes on responsibility for the conformity of the product. CE marking is a visible sign that the product complies with all relevant product supply law.Its presence together with the Declaration of Conformity gives the product to which it is affixed presumption of conformity with relevant product safety Directives. CE marked products are entitled to free movement throughout the European market.

The construction industry has gone through one of the most significant changes for a decade this year, when CE Marking of construction products became mandatory in all member states throughout the European Union and the European Economic Area. It’s also preparing itself for further change.

6 Aug 2013

Single storey buildings are by far the largest sector of the UK structural steelwork market, representing nearly two thirds of total activity.

These buildings are typically used for workshops, factories, industrial warehouses, distribution warehouses and retail warehouses. Referred to colloquially as ‘Sheds’ sizes vary from small workshops of just a few thousand square feet up to distribution warehouses covering over one million square feet.

Similar construction techniques are used in all of these buildings with Industrial type buildings usually having relatively simple elevations with metal cladding panels, either full height or down to a brickwork dado rail. Retail developments and other statement projects tend to have much more complex elevational treatments, incorporating various materials and features and using combinations of cladding panels with different orientations, profiles and colours.

5 Apr 2013

Metal Fabrication and its Importance in our Lives

The word “fabrication” means to make something from raw material. In the case of metal fabrication, that raw material is, unsurprisingly, metal. The material used in metal fabrication will however have already been processed from its true raw state into a usable raw material format such as metal sheet, rod, or bar.

Fabrication differs from assembling. Rather than using a processed raw material, the assembly process uses parts or components specifically made for the purpose. Assembly is however an operation that is included in the art of fabrication.

19 Mar 2013

The new steel framework fabrication and concreting service is yet another example of how PRV’s CEO Simon Jones won’t give the grass any chance to grow beneath the company’s feet. Following hot on the heels of recent new investments in the latest state of the art CNC machinery costing in excess of £1 million, this new venture demonstrates Simon’s passion and resolve for continuous expansion and diversification.

If you want Something Doing Right …

PRV have recently had their factory extended. But rather than waiting for someone else to provide the new steelwork frame and concreting, they took the bull by the horns and did it themselves. Drawings and specifications were provided by fully qualified architects, and PRV poured the concrete, and manufactured and erected the steelwork, all to specification. “It gives you more control over the process, including the timing”, said Simon, “and you know what they say? – If you want something doing right – do it yourself”!

Events

December 2024
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
3031